Skip to main content

An interdisciplinary debate on project perspectives

Table 12 Screening results and average duration

From: A methodological approach on the procedural effectiveness of EIA: the case of Sardinia

Result

EIA is required

EIA is not required

Typologies of project

No.

%

Avg dur

No.

%

Avg dur

1. Agriculture

1

20.0

147

4

80.0

208

2. Energy and extractive industries

24

48.0

227

26

52.0

290

3. Processing of metals and mineral products

   

1

100.0

189

4. Food industry

   

1

100.0

209

7. Infrastructures

6

4.9

278

117

95.1

221

8. Other projects

7

10.4

281

60

89.6

328

Total

38

15.4

243

209

84.6

260