An interdisciplinary debate on project perspectives
From: Improving the energy performance of the typical multi-family buildings in Amman, Jordan
Zone | Appliance | Heat output (W) (operating) | Heat output (W) (standby) | Operating (hour/day) time |
---|---|---|---|---|
Living room | Television | 315 | 20 | 6 h/day 11:00–12:00, 16:00–17:00, 20:00–22:00 |
Receiver | 140 | 5 | ||
Iron | 1500 | – | 2 h/day Saturday: 10:00–12:00 | |
Vacuum cleaner | 630 | – | 0.15 h/day 10:00–10:15 | |
2 laptops | 120 | 2 h/day 20:00–22:00 | ||
Kitchen | Refrigerator | 350 | 10 | 24 h/day |
Washing machine | 512 | 10 | 2 h/week Saturday: 8:00–10:00 | |
Kettle | 1200 | 5 | 0.15 h/day 6:00–6:05, 13:00:13:05 18:00:18:05 | |
Microwave | 800 | 5 | ||
Bedroom (in each) | Laptop | 60 | – | 1 h/day 21:00–22:00 |
Hairdryer | 250 | – | 1 h/day 6:00- 7:00 |