An interdisciplinary debate on project perspectives
Carbon–neutral station (M) | |
Size | Medium |
Daily Passenger | 10,000 |
Annual passenger | 3,000,000 |
Needs | |
Energy (kWh/year) | 4,500,000 |
Water (m3/year) | 60,000 |
Area (m2) | |
Gross Floor Area | 3000 |
Minimum expansion (m2) | 3300 |
Technical operating area | 150 |
Solar field | 900 |
Geothermal field | 2250 |
Additional volume (m3) | |
Water storage/treatment | 90.0 |
Compensatory green area | |
Urban forest (ha) | 4.5 |