Skip to main content

An interdisciplinary debate on project perspectives

Table 10 Generalization of the Blue Station model: medium station

From: From the “Green Station” to the “Blue Station”: the role of the renovation of railway stations in the ecological transition of cities. Calculation model and possible measures for mitigation and compensation of impacts.

Carbon–neutral station (M)

 Size

Medium

 Daily Passenger

10,000

 Annual passenger

3,000,000

Needs

 

 Energy (kWh/year)

4,500,000

 Water (m3/year)

60,000

Area (m2)

 

 Gross Floor Area

3000

Minimum expansion (m2)

3300

 Technical operating area

150

 Solar field

900

 Geothermal field

2250

Additional volume (m3)

 

 Water storage/treatment

90.0

Compensatory green area

 

 Urban forest (ha)

4.5