Skip to main content

An interdisciplinary debate on project perspectives

Table 11 Generalization of the Blue Station model: large station

From: From the “Green Station” to the “Blue Station”: the role of the renovation of railway stations in the ecological transition of cities. Calculation model and possible measures for mitigation and compensation of impacts.

Carbon–neutral station (L)

 Size

Large

 Daily Passenger

15,000

 Annual passenger

5,000,000

Needs

 

 Energy (kWh/year)

6,000,000

 Water (m3/year)

87,500

Area (m2)

 

 Gross Floor Area

5000

Minimum expansion (m2)

4450

 Technical operating area

250

 Solar field

1200

 Geothermal field

3000

Additional volume (m3)

 

 Water storage/treatment

131.0

Compensatory green area

 

 Urban forest (ha)

6.0