Skip to main content

An interdisciplinary debate on project perspectives

Table 12 Generalization of the Blue Station model: extra-large station

From: From the “Green Station” to the “Blue Station”: the role of the renovation of railway stations in the ecological transition of cities. Calculation model and possible measures for mitigation and compensation of impacts.

Carbon–neutral station (XL)

 Size

Extra-large

 Daily Passenger

30,000

 Annual passenger

10,000,000

Needs

 

 Energy (kWh/year)

10,000,000

 Water (m3/year)

150,000

Area (m2)

 

 Gross Floor Area

10,000

Minimum expansion (m2)

7500

 Technical operating area

500

 Solar field

2000

 Geothermal field

5,000

Additional volume (m3)

 

 Water storage/treatment

225.0

Compensatory green area

 

 Urban forest (ha)

10.0