Table 18 Medium scenario: Wedge 1.1 detailed calculations

From: From the “Green Station” to the “Blue Station”: the role of the renovation of railway stations in the ecological transition of cities. Calculation model and possible measures for mitigation and compensation of impacts.

Regenerative braking

 

Battery footprint

  

 Construction

4.18E−03

kWh/kWh

2.31E−01

m3/kWh

 Use

4.00E−04

kWh/kWh

1.43E−04

m3/kWh

Incoming cruise energy

392.01

kWh/train

Recovery capacity

58.80

kWh/train

Daily train

235

 

Daily capacity

13,818.27

kWh

Accumulation capacity

13,000.00

kWh

Gross cost of the plant

3,250,000.00

Euro

Average service life

10

years

Footprint/year

  
 

1905.33

kWh

 

978.84

m3

Net production

  
 

4,031,344.67

kWh

 

− 978.84

m3

Wedge effect on the balance

  
 

94.7%

Energy

 

100.3%

Water

 

96.1%

Total