Table 3 Wedge 2—rainwater collection and partial gray water reuse: assumptions.

From: From the “Green Station” to the “Blue Station”: the role of the renovation of railway stations in the ecological transition of cities. Calculation model and possible measures for mitigation and compensation of impacts.

Water collection sizing

  

Construction

337.50

kWh/m3

4.20E−01

m3/m3

Use

2.78

kWh/m3

1.18E−04

m3/m3

Gross cost of the system

80.00

Euro/m3

Average service life

15