Table 27 Optimal scenario: Wedge 3 detailed calculations—1

From: From the “Green Station” to the “Blue Station”: the role of the renovation of railway stations in the ecological transition of cities. Calculation model and possible measures for mitigation and compensation of impacts.

Geothermal probes

  

1. Footprint

  

 Probes

  

  Construction

2.3200

kWh/m

 

24,378

m3/m

  Use

1747

kWh/m

 

0472

m3/m

 Storage tank/boiler

  

  Construction

418E−03

kWh/m3

 

127E−01

m3/m3

  Use

400E−04

kWh/m3

 

787E−03

m3/m3

2. Reference area

33.63670

m2

3. Thermal needs

3.36367

kW

4. Geothermal power

1.68184

kW

5. Drilling depth

12,000

m

6. Number of 4-pipes probes

140

 

7. Storage tank/boiler

84.000

l

Annual production

44.198.62380

kWh

Gross cost of the plant

4.633.885

Eur

Drilling

1.512.000

 

Installation and cementation of the probes

504.000

 

Heat pump

1.513.652

 

Storage tank/boiler

29.400

 

Design

266.929

7.50%

Works supervision, testing assistance

177.953

5.00%

Testing

78.299

2.20%

Safety charges not included in unit costs

124.567

3.50%

Surveys, assessments and investigations

71.181

2.00%

Connection to the grid

177.953

5.00%

Unforeseen costs

177.953

5.00%

Average service life

25

years

Footprint/year

  
 

1.588.390,31

kWh

 

31.482,32

m3