Skip to main content

An interdisciplinary debate on project perspectives

Table 9 Generalization of the Blue Station model: small station

From: From the “Green Station” to the “Blue Station”: the role of the renovation of railway stations in the ecological transition of cities. Calculation model and possible measures for mitigation and compensation of impacts.

Carbon–neutral station (S)

 Size

Small

 Daily Passenger

5000

 Annual passenger

1,500,000

Needs

 

 Energy (kWh/year)

3,000,000

 Water (m3/year)

33,750

Area (m2)

 

 Gross Floor Area

1500

Minimum expansion (m2)

2175

 Technical operating area

75

 Solar field

600

 Geothermal field

1500

Additional volume (m3)

 

 Water storage/treatment

51.0

Compensatory green area

 

 Urban forest (ha)

3.0