Abstract

This paper is a contribution to a special issue of “Interdisciplinarity and governance in water landscapes” with a critical reflection on the “Marta-Bolsena-Tarquinia” River, Lake, and Coast Contract research experience in the Lazio Region. This Contract is the only one in Italy that covers three different water landscapes, from lake to coast (Lake Bolsena, the river Marta and the Tarquinia coastline), all in the same water basin. However, despite the ambitious premises, research shows how this Contract has partially failed. Indeed, the in-depth study offers a commentary not only to better understand what did not work in this River, Lake, and Coast Contract process, but also to suggest how to move on from a formal coalition, towards much more cooperative practices by reforming the redistribution of responsibilities, power, and knowledge.

Introduction and research outline

Water landscapes are areas with great environmental, economic, and cultural values, as well as being a catalyst for significant challenges to territorial planning practices. River ContractsFootnote 1 have been introduced in the last 20 years to recover and preserve environmental resources in areas such as these (Naveh and Carmel 2002; Berger et al. 2007; Bréthaut and Pflieger 2015). As is well known, River Contracts are integrated and negotiated territorial planning tools based on voluntary agreements specifically designed to tackle water landscape challenges.

The authors report findings from a recent research opportunityFootnote 2 which supports the process of the “Marta-Bolsena-Tarquinia” River, Lake, and Coast Contract in dealing more effectively with water landscape challenges in the Tuscia area. In brief, this contract tried to respond to the complex environmental and territorial challenges of the three water landscapes through a process that involved both institutional and non-institutional actors.Footnote 3 In this context, in seeking adequate territorial planning tools, some research questions about the potential and the limits of the River Contract emerged. Indeed, this planning tool clearly: (a) encourages the appropriate redefinition of the variable target area perimeters, (b) requires the implementation of territorial participatory processes, but it usually takes the need for important governance innovations for granted.

The paper argues that it is none other than the low quality of governance in the process that led to the failure of the “Marta-Bolsena-Tarquinia” River, Lake, and Coast Contract to deal with the relevant challenges of this water landscape. Field and theoretical research output suggest practices to support this non-mandatory territorial planning tool in dealing with water landscapes by explicitly pursuing necessary governance innovations.

In conclusion, the paper is structured as follows. After an outline of the research methodology, the first part presents the theoretical framework of territorial planning approaches and tools to tackle environmental challenges, with specific reference to River Contracts. In the second part, the case study shows the main challenges of the water landscapes in the northern Lazio region, and the whole process of the “Marta-Bolsena-Tarquinia” River, Lake, and Coast Contract, clarifying the actors’ network relationships and the most critical governance issues. Finally, the paper provides findings, and more general conclusive recommendations for innovating the planning tools in water landscapes with a radical transformation of territorial governance.

Methodological notes

The paper analyses the implementation process of the “Marta-Bolsena-Tarquinia” River, Lake, and Coast Contract, in the north of the Lazio Region (Italy). During one and a half years, from October 2020 to February 2022, the research used a qualitative methodological approach based on desk analysis, informal conversations, semi-structured interviews,Footnote 4 project manager shadowing, and participatory observations. In detail, participatory observations of the process, shadowing of the project manager and informal conversations with all the participants of the process produced fieldwork notes as part of the qualitative information. The shadowing was also designed to investigate the entire network of actors from the manager’s perspective, just as the interviews and the participatory process observations improved understanding of the relationships among institutional and non-institutional actors.

In addition, the desk analysis included local documents relating to the area and the implementation process. Reports from the Regional Environmental Protection Agency ARPA-Lazio have been used to provide data on the environmental status of the water, while reports from the National Institute of Statistics were used for the same purpose in relation to the productive system, demography, and facilities provision.

Last but not least, the research included the construction of a theoretical framework on territorial planning tools for better addressing environmental issues in large-scale planning. The theoretical framework guided the fieldwork and the analysis of the data was also helpful in reaching conclusions in other contexts beyond the case study.

Theoretical framework

In the last thirty years, the most critical and emerging environmental issues have required new planning tools based on flexibility, interaction, adaptability, and knowledge production (Ali 2003; De Leo and Forester 2017; Lana and McDonald 2005; Hage et al. 2010; Evans 2011). This is particularly evident in the literature on water landscape management, which has reported a progressive change in the approaches used by planners (Healey and Shaw 1994; Margerum 1997; Van der Brugge et al. 2005; Schoeman et al. 2014). Indeed, the failure of traditional water management has removed the underlying assumption that uncertainty is predictable and change reversible within natural systems (Schoeman et al. 2014). Looked at it from another perspective, planning processes have considered complexity and uncertainty while looking closely at the connections between societies, economies, and the environment as an alternative approach (Pahl-Wostl et al. 2011; Martinez et al. 2011; Cook and Spray 2012). According to these approaches, tackling environmental challenges is based on the redefinition of territorial scale by accepting that appropriate treatment of environmental issues usually exceeds administrative perimeters. For this reason, national and international planning literature has long been focused on the link between the appropriateness of scales and the research and debate about the efficiency of territorial planning tools (Born and Purcell 2006; Selman 2006; Mendes 2007; Lowe 2011).

The redefinition of scale is particularly relevant for planning where environmental challenges exist, because water, river, forest, and other resources do not respect administrative perimeters. The redefinition of perimeters around a water basin, a river or a forest involves a plurality of actors and interests on different scales (Kaika 2003). This requires different relations among actors and the new governance structures (Hering and Ingold 2012). Indeed, large-scale territorial planning and reframed administrative boundaries (the so-called territorial “variable geometries”) result in a broad reconfiguration of institutional and non-institutional actors (included or excluded) in the process. It creates new opportunities to construct territorial plans based on institutional learning and cooperative forms of territorial governance (Medema et al. 2008). In these terms, scale represents the spatial and temporal anchor to deal with a larger range of actors and issues than has influenced territorial planning so far (Swyngedouw 1997; Galland and Elinbaum 2015).Footnote 5

In 2000, the European Commission established the European Water Framework Directive (Directive 2000/60/EC) based on:

  • Extensive public consultation and the participation of a wide range of territorial actors,

  • The identification of an appropriate scale of intervention concerning environmental resources,

  • A specific focus on community action to maintain and improve the quality of water resources,

  • The connection between water management, wide-scale planning, and new forms of governance.

Within this framework, the River Contract represents a set of voluntary and negotiated planning tools that implement these European directives through a comprehensive long-term project aimed at protecting nature, reversing the degradation of ecosystems, and promoting extended public arenas.

Literature on River Contracts confirms that the main points outlined above deal better with environmental issues and that the most successful River Contracts have usually produced new governance structures (Bréthaut and Pflieger 2015; Scholz and Stiftel 2005). Indeed, by overcoming administrative boundaries, this tool could strengthen the cooperation between water management and territorial planning practices (Carter and Howe 2006; Kidd and Shaw 2007). This re-proposes the issue of the appropriateness of the corresponding planning tools, regulations, norms and, last but not least, the availability and quality of technical expertise (Carter 2007).

In Italy, right from the first experiences (Barbanente and Monno 2005; Magnaghi 2008; Pizziolo and Micarelli 2011) to the most recent ones (Caruso et al. 2020; Pappalardo 2021; Pisano and Lingua 2021), the River Contract has been considered a useful tool to: (a) overcome the limits of the sector plans (Magnaghi 2008); (b) integrate the management of water resources with a wider governance dimension (Bobbio and Saroglia 2008); (c) call for an integrated perspective of the territory, which would otherwise not be visible on a local scale (D’Onofrio 2011).

The national debate has largely focused on the redefinition of planning scales by considering a possible intermediate level of government between regions and municipalitiesFootnote 6 (Barbieri and Giamo 2014; Governa 2014). The debate highlighted how the supra-municipal scale is much more appropriate for handling complex issues, especially those related to environmental challenges. Nevertheless, in the Italian context, the definition of the most appropriate perimeters has struggled to translate into different and collaborative forms of governance. Even the most exemplary cases demonstrate that collaborative and cooperative processes tend to remain exceptional and temporary, struggling to promote new and flexible governance configurations (Marchigiani 2006). It would require a considerable investment of economic, social, and cognitive resources to improve coordination practices between actors and policies (Fregolent 2006). Indeed, in most regional and sub-regional Italian contexts, research have confirmed that collaboration and cooperation are critical aspects of territorial planning processes (Gabellini 2018). This stems from various factors. At the regional level, especially in the specific context of the Lazio Region, the traditional Region’s dependence on the Capital would suggest that the territorial processes would be more conditioned by the central level rather than the local one with consequences in planning (Cremaschi 2009).Footnote 7 At other levels, the literature has identified a negative attitude towards collaborative and cooperative practices among municipalities, accompanied by a general weakening or even absence of provincial and inter-municipal territorial planning tools (Lingua 2016). At the local level, the small size of technical offices and the limited diffusion of planning practices and attitudes represent crucial factors in the public action (Xilo and Baldi 2012).

In conclusion, the selected theoretical framework serves to underline that environmental challenges require governance reform and change (Fonseca and Ramos 2008; Grävingholt and von Haldenwang 2016; Zwet and Ferry 2019; Mattila et al. 2020; Göransson et al. 2021) that River Contracts could support and deliver. Since the River Contract may provide an opportunity to extend planning practice beyond administrative boundaries and sectoral approaches (Eckerberg and Joas 2004; Magnaghi and Giacomozzi 2009; Bastiani 2011), the following analysis of even a failed process might be useful for highlighting key elements and understand how to improve this planning tool for the water landscape.

The case study of the River, Lake, and Coast Contract in the Lazio Region

The context: three water landscapes, challenges and problems

The “Marta-Bolsena-Tarquinia” River, Lake, and Coast Contract includes three different water landscapes in a complex ecosystem that stretches from the hinterland to the coastal territory: from the lake (the Bolsena) to the river (the Marta), and to the coast (of Tarquinia). Although inherently different, the three systems interconnect in terms of hydrogeological, social, and spatial relations (Coccossis 2004). The area of the Contract includes 12 small and medium municipalitiesFootnote 8 within three different water landscapes: the lacustrine landscape in the most inland areas, the fluvial landscape, and the coast. These landscapes are a product of different but interconnected evolutionary histories, both from the naturalistic-geological and the anthropic- settlement points of view. The pressure on the infrastructure, settlement, and mobility systems affects the three water landscapes, which already struggle with delicate socio-ecological balances.

A broad look at the three-landscape system shows that, in terms of territorial relationships and mobility, the Contract area is well connected with the main cities of Rome and Viterbo, while the connection with minor centers is weaker. The proximity to the metropolitan City of Rome and the fragmented infrastructural system has erosive effects on the quality of life in some of the small urban centers. The poorly organized transportation and dispersed education and health systems have increased passive mobility to neighbouring centers in Umbria, Tuscany, and the Capital for the supply of services (Fig. 1). As to the productive system, the whole landscape is characterized by an agricultural and proximity economy presently in crisis, which includes hazelnut monoculture, vineyards, olive groves, and other local agricultural produce (Fig. 2). The abandonment of some agricultural areas and the resulting loss of land values has led to uncontrolled conversion to photovoltaic fields, with potential consequences for the environment. Where agriculture survives, it is experiencing the intensification of monocultures while the presence of the BiodistrictFootnote 9 pushes towards organic production. Another poorly planned economic sector is seasonal tourism, prevalent in the hinterland close to the lake and along the Tyrrhenian coast.

Looking at each landscape in greater detail, the water of Lake Bolsena is subjected to ongoing deterioration due to a concentration of pollutants, with a consequent increase in environmental risks. Lake Bolsena has no tributaries and the renewal of water in the lake is slow (estimated at approximately 300 years). It takes in liquid sewage through a collector connected to municipalities around the lake. The collector provides the most important protection against pollution. However, its maintenance is irregular, with consequent spillageFootnote 10 adding to the unofficial dumping of sewage.

Since the 1960s, urban settlements have represented a system polarized between historical areas with medieval settlements in the northern part of the basin and contemporary expansion with nineteenth and twentieth century settlements in the southern part. For example, the most recent buildings impact the lake by influencing the quality of water and landscape. Unrestricted tourism has led to building expansion as well as the establishment of campsites and holiday accommodation. The anthropogenic pressure resulting from these activities negatively affects the lacustrine landscape, further exacerbating the already fragile balance of the lake.

With regard to the river Marta (Fig. 3), its proximity to the lake—of which it is an emissary—links the two water bodies inseparably in respect of pollution problems and environmental risks. Indeed, the slow rate of water renewal of the lake negatively affects the ecological and chemical quality of the water.Footnote 11 The sewage treatment plant collector connected to the lake should protect the outflow, but it suffers from the same maintenance problems as mentioned above. Moreover, the river has been experiencing a quantitative water emergency due to extraction for irrigation, especially in the summer (Fig. 4). In general, the river landscape is characterized by medium-sized hills and some mountains, where the human settlements are mainly distributed along the roads connecting the coast to the hinterland in perpendicular lines.

The coastal landscape includes protected areasFootnote 12 of great environmental value, characterized by complex environmental relations (Fig. 5). However, it is also affected by the anthropic pressures mentioned above, including trawling, anchoring, beach tourism, all of which increase environmental risks.Footnote 13 Moreover, the coast is affected by erosion caused by the subtraction of sand for construction materials, the destruction of vegetation and coastal dunes due to the construction of port facilities, and the degradation of the ecological system for the supply of fresh water from the aquifer. The settlement system on the coast also influences the environment and the quality of water. It is mainly informal buildings along the coast and around the original centers. The perpendicular roads leading off the main coastal road are the main connections to the hinterland.

In this context, the historical lack of regulations has exacerbated the negative effects in terms of ecological-environmental risks (authors 20222023). In addition, anthropic pressure due to mobility, unauthorized urban expansion, touristic vocation of some areas, etc., abandonment of agricultural lands, unplanned photovoltaic installations, and a lack of control of water system leaks has contributed to a complexity of risks in a landscape already compromised by climate change (Bizikova et al. 2014; Webb et al. 2017).

The contract process: timeline, actors, and actions

In 2015, the Lazio Region officially joined the National Charter for the River Contracts.Footnote 14 In 2017, the Region, together with the University of Tuscia, met with the mayors of the municipalities overlooking Lake Bolsena to propose a way to create the partnerships required by the Contract.Footnote 15 A group of associations for the protection of Lake Bolsena organized a meeting to define common goals for the Contract. At the end of the same year, in the Province of Viterbo, an initial Manifesto for proceeding with the Lake Bolsena Contract was signed. After its publication and public presentation, other local authorities, including the municipalities of Tuscania and Tarquinia, as well as numerous associations in the area, applied to participate. Thus, in December 2018, the Lake Bolsena Contract became the Contract of Lake Bolsena, the river Marta and the Tyrrhenum coast around Tarquinia, with the signing of an additional Manifesto of IntentFootnote 16 which consisted of:

  • Motivations, specific criticalities, working methods, and general objectives,Footnote 17

  • Definition of governance structure for the process, coordination committee, steering committee, manager, etc.

In the second phase, the Universities elaborated the Integrated Cognitive Analysis to support the definition of the medium-to-long term goals in the Strategic Document. During this phase, the implementation process was slowed down by the onset of the pandemic, which limited the actors involved to meeting online. The last phase was to define the terms of the Action Programme, including obligations, schedules, implementation modalities, and financing.

Fig. 1
figure 1

The province of Viterbo (left),—Contract Area and mobility flux (right). Elaborated by the authors

Fig. 2
figure 2

Landscape near to the Lake of Bolsena. Author 2022

Fig. 3
figure 3

The Marta River and the and the municipalities crossed by the river, source: GoogleMaps, elaborated by the authors

Fig. 4
figure 4

Olive groves and vineyards near the Lake and River. Author 2022

Fig. 5
figure 5

The coastal area with different land use and the mouth of the Marta River, source: GoogleMaps, elaborated by the authors

The actor network involved reflects a variety of requirements and issues as well as different fields of expertise. The two Universities, with their participating departments, contributed to the interdisciplinarity of the process. In particular, the Department of Territorial Planning supported the definition of the participatory process for integrating expert and technical knowledge with already existing expertise and that available at a local level. In addition to the Universities, the public sectors and institutions involved were the municipalities and the province of Viterbo. The public investment company Talete S.p.A.,Footnote 18 which is the managerial operator of the territory’s Integrated Water Service, was involved. Other territorial actors from civil society, were grassroots organisations belonging to the sectors of agriculture, environmental protection, and tourism. In addition, the process was also open to private citizens. All together, the stated interests included environmental protection, water management, monitoring and maintenance of sewage collectors and the quality of water, and the development of agriculture and tourism.

Participatory observations and the shadowing of the project manager revealed a general absence of active and responsible institutional actors throughout the entire process. In particular, the province turned out to be hardly involved in the process. This strongly discouraged municipalities from assuming an active and propositional role. Moreover, the technical and administrative staff showed a low level of participation due to being understaffed in most municipalities.

As to the water issue, the managing Authority (Talete S.p.A.) was evasive, and the institutional actors had a defensive response by referring to managerial inefficiencies with: “it's Talete’s fault”. The saying “it’s Talete’s fault” was the mantra throughout, even though Talete is co-financed by public funds. This was one of the factors that limited the change in dynamics and relations between local authorities.

Even if the process was open to the involvement of the local population, there was a low level of participation. From the interviews, one reason has been attributed to “difficulties in involving the traditionally non-active part of the citizenship”,Footnote 19 which, in fact, remains on the margins of any public process. However, a recurring issue, that emerged from the participatory process as relevant is the centrality of collaboration among institutions, administrations, and citizens for an effective resolution of the main problems. Indeed, participants referred to “a lack (…) of and necessary active presence of local institutions in that kind of process”.Footnote 20 Thus, the fieldwork showed difficulties in collaboration not only among institutional levels as the theoretical framework enlightened but also between institutions and citizens. On the one hand, the presence of local institutions was limited to essential meetings and mostly absent in the participatory process. On the other hand, albeit low participation of the citizenry called institutions back to their role as participating actors in the process.

Despite the small number of participants, the heterogeneity among them resulted in the emergence of transversal themes related to various fields, including environmental protection, public health, the economic and productive system, as well as the system of knowledge, culture, and conscious citizenship..

During the participatory process, contrasting positions emerged, mainly concerning agriculture. The most critical issues discussed during public meetings were controversies over hazelnut monoculture and the photovoltaic transition on agricultural land.Footnote 21 On the one hand, pressures from the transition-to-organic group clashed with those supporting intensive agriculture. On the other hand, declining agricultural land values have favoured the uncontrolled expansion of photovoltaic land use. The promoters of the “Biodistrict”—even if not formally involved—collided with the farmers over the use of pesticides and the shortsightedness of Province and Lazio Region politicians. In addition, dedication to tourism in some areas clashed with demands for nature protection, leading to opposing factions.Footnote 22

The value of the landscape did not emerge amidst the production of social, economic, and ecological values. Despite the complexity of the three landscapes, interconnected by water, the creation of a shared knowledge system took center stage while the importance of water remained in the background. Moreover, interviews did not highlight water scarcity as a concern, but rather focused on issues related to pollution and environmental degradation. In all the participatory meetings, members of environmental associations emphasized that “the coast (…) are subjected to degradation problems due to tourism”; when talking about the lake, every participant in the process denounced “problems with the collector which increase pollution”Footnote 23 and the lack of responsibility of public institutions and Talete SpA. All this evidence demonstrates that neither institutional nor non-institutional stakeholders changed their approach to water, continually reflected in a posture that was almost defensive rather than cooperative.

Findings and recommendations

The research showed that the implementation of the River Contract in the studied area did not result in the adoption of new approaches to improve interventions in these water landscapes. Despite the “Marta-Bolsena-Tarquinia” River, Lake, and Coast Contract’s ambitions, environmental problems persisted, and significant issues remained unresolved.Footnote 24 Neither institutional nor non-institutional actors considered the interconnectedness of the trio of lacustrine, fluvial, and coastal landscapes within the same water basin. The divisive nature of the water theme demonstrated the lack of collaboration among the various territorial actors, the absence of institutions in the participatory process, and the weakness of local community interests, resulting in a lack of trust in the Contract and no impacts on environmental risks and challenges.

The institutional representatives of the promoting actors, including the Province and the Municipalities, did not alter their internal or external relationships with each other or with the citizens. The limited involvement and commitment of local institutions did not establish a long-term structured engagement mechanism for inter-institutional collaboration. This impeded potential learning processes and networking capabilities. As a result, coordination and collaboration skills remained concentrated in external subjects, such as project managers, visionary pensioners, and third sector protagonists, rather than becoming a shared public heritage.

Finally, the general resistance to deeper integration and inter-institutional collaboration has revealed the limitations of the Contract as a tool, which would benefit from a greater culture of cooperation and co-responsibility among all the institutional and non-institutional actors involved.

In addition, this case study suggests that the potential of the voluntary nature of the Contract has not been fully realized. On the one hand, the voluntary nature of the tool has an innovative potential to protect water resources, considering:

  • The absence of formal boundaries and the opportunity of integrating water landscapes whose interrelationships are often underestimated and difficult to address,

  • The construction of participatory and multi-level arenas to take charge of the unavoidable environmental and anthropic issues of a vast and deeply interconnected area.

On the other hand, the continuity of its goals within a programmatic territorial vision strongly depends on the commitment of the elected representatives. Therefore, a commitment to large-scale planning would allow for more tenacious long-term processes and programs.

Moving forward, it is necessary to intentionally transform territorial governance in a more targeted way than hitherto. The selected theoretical framework and the critical reflection on the case suggest:

  • Prioritizing increasing the capacity of institutions to cooperate with each other and with civil society,

  • Reallocating public responsibilities, including those for the environment and landscape, within the territory,

  • Structuring permanent (and not contingent) collaborative processes to build a critical population that shares knowledge, skills, abilities, and responsibilities.

That having been said, we propose a transition from a “formal managerial coalition” to “real cooperative governance”. This entails improving the capacity of tall actors, including local, political, and institutional, to share information, responsibility, knowledge, and power. The findings and the suggestions above-mentioned provide valuable pointers for redirecting cognitive, financial, and staff resourcesFootnote 25 towards a “real cooperative governance”, thereby addressing the weaknesses identified in the territorial process. It is only through a culture of cooperation that tools such as the Contract can become more effective in addressing the relevant issues posed by water landscapes today.

Availability of data and materials

Not applicable’ for that section.

Notes

  1. The River Contract is a voluntary tool that applies European directives on water protection and environmental regeneration through the activation of participatory processes with local authorities, citizens, environmental associations, and local entrepreneurs. The tool is a shared commitment to pursue multi-objective interventions in a multi-actor and collaborative context (White and Howe 2003; Grindlay et al. 2011).

  2. The two authors supported part of the Contract’s participatory process and the construction of the cognitive analysis of the area. Two different university departments – with competencies in different but complementary disciplines – were involved in the process as expert support.

  3. The institutional actors consisted of 12 municipalities, the province of Viterbo, the Local Health District, and two Universities. The private actors involved in the process were: the management agency of Talete S.p.A. (private-public company) for water supply, 6 local trade associations, and one farm. Organized civil associations participating in the process were composed of 18different grassroots organisations concerned with environmental protection, agriculture, and tourism, 3 labour unions, and an action group for local development. In addition, a number of private citizens were involved.

  4. More than 50 interviews were conducted, in different parts of the process, including the Contract Committee members, mayors, and the project manager.

  5. Although there is no room here to discuss controversies or conflicts, it is well known that there is extensive literature that criticizes the communicative or collaborative planning practices (e.g., Forester 1987; Healey 1992) for relying too heavily on consensus and cooperation. Due to the number of instances of land usage, urban planning, public space, and landscape, the controversial nature of these processes have been explored in Italian literature by, among others, Bobbio 2011; De Leo and Lo Piccolo 2015; Fregolent 2015.

  6. In planning, the regional level, albeit with differentiated manners, declines the national framework and provides guidelines for the territories. With respect to River Contracts, the regions have defined the regulatory framework in order to encourage the use of the Contract tool in a consistent way with national guidelines within the different territories.

  7. For deepening the role of the Lazio Region in local planning, see Cremaschi 2009.

  8. Municipalities range in population from about 1000 to 3000, with the obvious exception of the capital municipality of Viterbo (67488 pop.), Tarquinia (16269 pop.), Vetralla (13978 pop.), Montefiascone (13053 pop.) and Tuscania (8323 pop.).

  9. The Biodistrict of Lake Bolsena is not part of the process. It represents a specific area where farmers, citizens, tourism operators, associations and public administrations agree to safeguard organic land.

  10. To this end, reconnaissance activities are already planned for a census of untraced discharges by Talete S.p.A.

  11. ARPA-Lazio Report (2021). La qualità delle acque dolci superficiali destinate alla vita dei pesci della regione Lazio - Triennio 2018-2020, p. 10.

  12. There is one “Special Protection Area” – to safeguard the habitats of migratory birds – and two “Sites of Community Importance” – for the maintenance of biological diversity.

  13. One effect is the regression of the Posidonia plant, which has safeguarded a good balance of biodiversity and oxygen, as well as mitigating the erosive phenomena of the sea on the coast.

  14. From the perspective of institutional action, 21 projects were initiated for homogeneous territories, both in terms of morphological, geographic, and spatial characteristics and weaknesses in the urban-territorial guidance and intervention system.

  15. The initial proponents of the project were the municipalities close to the lake. In December 2017, the first signing involved: 7 public bodies, including the Province of Viterbo, 3 trade associations, 1 agricultural company, and 10 civil associations.

  16. Later in the creation of the Lake, River, and Coast Contract, 6 municipalities, 3 labour unions, 8 new associations, 3 additional trade associations, 5 private citizens, one Local Action Group, the Local Health District of Viterbo, and the authors’ University joined. In addition, new applications have recently arrived and will be processed at the earliest possible date.

  17. Also established for the pursuit of obligations under Article 4 of Directive 2000/60/EC and subsequent directives.

  18. The Lazio Region, the Province of Viterbo and all the adhering Municipalities co-fund the company (By Act No. 17 of 31/07/2003, the Conference of Mayors No. 1 Lazio Nord, see Talete's official website available at: https://www.taletespa.eu/it).

  19. From interview with PM, in October 2021. The involvement of citizens was through public promotion of the process.

  20. From interviews with participants, in October 2021

  21. 05-12-15/10/2021 public meeting where the conflict emerged and was recorded.

  22. From online meetings in June 2021 and public meetings on 05-12-15/10/2021

  23. From interviews conducted in September 2021 and the notes taken during the participatory process.

  24. For example, hazelnut monoculture vs. other local agricultural productions; use of pesticides in traditional agriculture vs the promotion of the "Biodistrict"; moves to protect the environment vs. the interests of the tourist industry in some areas.

  25. According to this perspective, the public and private sectors (thus, also Talete S.p.A.) as well as citizens are part of the actors involved in the redirection of resources.

References

  • Ali SH (2003) Environmental planning and cooperative behavior: catalyzing sustainable consensus. J Plan Educ Res 23(2):165–176

    Article  Google Scholar 

  • ARPA-Lazio Report (2021) La qualità delle acque dolci superficiali destinate alla vita dei pesci della regione Lazio - Triennio 2018–2020: 10.

  • De Leo D, Altamore S (2023): Why multi-stakeholder practices don’t work: looking beyond the extent and diversity of actors for co-producing collective action; a case study from an inner area in Italy. Planning Practice & Research, 38(3):1–17. https://doi.org/10.1080/02697459.2023.2199647

  • Barbanente A, Monno V (2005) Changing discourses, practices and spaces of coexistence: perspectives for the environmental regeneration of the Ofanto River Basin. Plan Theory Pract 6(2):171–190. https://doi.org/10.1080/14649350500136939

  • Barbieri CA, Giamo C (2014) Nuovo modello di governance istituzionale e nuova pianificazione del territorio in Italia. Urbanistica 65(153):90–93

    Google Scholar 

  • Bastiani M (2011) Contratti di fiume. Pianificazione strategica e partecipata dei bacini idrografici. Approcci, esperienze, casi studio. Dario Flaccovio Editore, Palermo

    Google Scholar 

  • Berger T, Birner R, Mccarthy N, Díaz J, Wittmer H (2007) Capturing the complexity of water uses and water users within a multi-agent framework. Water Resour Manage 21(1):129–148. https://doi.org/10.1007/s11269-006-9045-z

    Article  Google Scholar 

  • Bizikova L, Crawford E, Nijnik M, Swart R (2014) Climate change adaptation planning in agriculture: processes, experiences and lessons learned from early adapters. Mitig Adapt Strat Glob Change 19(4):411–430. https://doi.org/10.1007/s11027-012-9440-0

    Article  Google Scholar 

  • Bobbio L (2011) Conflitti territoriali: sei interpretazioni. J Land Use Mobility Environ 4(4):79–88

    Google Scholar 

  • Bobbio L, Saroglia P (2008) Lungo il fiume delle politiche contrattualizzate Dall’esperienza francese al caso piemontese. Laboratorio di Politiche-Corep, Torino

    Google Scholar 

  • Born B, Purcell M (2006) Avoiding the local trap: scale and food systems in planning research. J Plan Educ Res 26(2):195–207

    Article  Google Scholar 

  • Bréthaut C, Pflieger G (2015) The shifting territorialities of the Rhone River’s transboundary governance: a historical analysis of the evolution of the functions, uses and spatiality of river basin governance. Reg Environ Change 15:549–558

    Article  Google Scholar 

  • Carter J (2007) Spatial planning, water and the water framework directive: insights from theory and practice. Geogr J 173(4):330–342. https://doi.org/10.1111/j.1475-4959.2007.00257.x

    Article  Google Scholar 

  • Carter J, Howe J (2006) The water framework directive and the strategic environmental assessment directive: exploring the linkages. Environ Impact Assess Rev 26(3):287–300. https://doi.org/10.1016/j.eiar.2005.05.001

    Article  Google Scholar 

  • Caruso E, Lingua V, Pisano C (2020) Il contratto di fiume come patto per la rinascita della comunità. Un approccio sistemico di mediazione istituzionale. Paper presented at the VI National Conference Society of Territorialists, Castel Del Monte, 15–17 November 2018.

  • Coccossis H (2004) Integrated coastal management and river basin management. Water Air Soil Pollut Focus 4(4):411–419. https://doi.org/10.1023/B:WAFO.0000044814.44438.81

    Article  Google Scholar 

  • Cook BR, Spray CJ (2012) Ecosystem services and integrated water resource management: different paths to the same end? J Environ Manage 109:93–100

    Article  Google Scholar 

  • Cremaschi M (ed) (2009) Atlante e scenari del Lazio metropolitano. Donzelli, Roma

    Google Scholar 

  • De Leo D, Altamore S (2022) Territori intermedi del Lazio e Contratti di Fiume. Interpretazioni e strumenti per territori né metropolitani né interni ARCHIVIO DI STUDI URBANI E REGIONALI 53(135): 27–44. https://doi.org/10.3280/ASUR2022-135002

  • De Leo D, Forester J (2017) Reimagining planning: moving from reflective practice to deliberative practice - a first exploration in the Italian context. Planning Theory & Practice 18(2): 202–216. https://doi.org/10.1080/14649357.2017.1284254

  • De Leo D, Lo Piccolo F (2015) Planning in the face of conflict in un-democratic contexts: lessons from two Sicilian municipalities. In: Gualini E, Allegra M, Mourato JM (eds) Contested urban spaces and local democracy. Jovis Verlag GmbH, Berlin

    Google Scholar 

  • D’Onofrio R (2011) Città diffusa, forma urbana e paesaggio. Urbanistica DOSSIER 125:45–47

    Google Scholar 

  • Eckerberg K, Joas M (2004) Multi-level environmental governance: a concept under stress? Local Environ 9(5):405–412. https://doi.org/10.1080/1354983042000255315

    Article  Google Scholar 

  • Evans JP (2011) Resilience, ecology and adaptation in the experimental city. Trans Inst Br Geogr 36(2):223–237

    Article  Google Scholar 

  • Fonseca FP, Ramos RAR (2008) Rural areas towards a challenge to territorial governance: the case of the portuguese municipality of Almeida. WSEAS Trans Environ Dev 4(6):555–565

    Google Scholar 

  • Forester J (1987) Planning in the face of conflict: negotiation and mediation strategies in local land use regulation. J Am Plann Assoc 53(3):303–314

    Article  Google Scholar 

  • Fregolent L (2006) La pianificazione d’area tra direttive europee ed esperienze. Archivio di studi urbani e regionali. https://doi.org/10.1400/69734

    Article  Google Scholar 

  • Fregolent L (2015) Trasformazioni territoriali e proteste dai cittadini: un caso studio. Economia e Società Regionale 3:70–81

    Google Scholar 

  • Gabellini P (2018) Le mutazioni dell’urbanistica. Principi, tecniche, competenze. Carocci, Roma

    Google Scholar 

  • Galland D, Elinbaum P (2015) Redefining territorial scales and the strategic role of spatial planning: evidence from Denmark and Catalonia. Plan Rev 51(4):66–85. https://doi.org/10.1080/02513625.2015.1134963

    Article  Google Scholar 

  • Göransson G, Van Well L, Bendz D, Danielsson P, Hedfors J (2021) Territorial governance of managed retreat in Sweden: addressing challenges. J Environ Stud Sci 11(3):376–391. https://doi.org/10.1007/s13412-021-00696-z

    Article  Google Scholar 

  • Governa F (2014) Tra geografia e politiche. Donzelli Editore, Roma

    Google Scholar 

  • Grävingholt J, von Haldenwang C (2016) The promotion of decentralisation and local governance in fragile contexts. Discuss Paper. https://doi.org/10.1314/RG.2.2.19927.88480

    Article  Google Scholar 

  • Grindlay AL, Zamorano M, Rodríguez MI, Molero E, Urrea MA (2011) Implementation of the European water framework directive: integration of hydrological and regional planning at the Segura River Basin, southeast Spain. Land Use Policy 28(1):242–256

    Article  Google Scholar 

  • Hage M, Leroy P, Petersen AC (2010) Stakeholder participation in environmental knowledge production. Futures 42(3):254–264

    Article  Google Scholar 

  • Healey P (1992) Planning through Debate: The Communicative Turn in Planning Theory. The Town Planning Review 63(2): 143–162. https://www.jstor.org/stable/40113141

  • Healey P, Shaw T (1994) Changing meanings of' environment' in the British planning system. Transactions of the Institute of British Geographers 19(4): 425–438. https://www.jstor.org/stable/622833

  • Hering JG, Ingold MK (2012) Water resources management: what should be integrated? Science 336(6086):1234–1235

    Article  Google Scholar 

  • Kaika M (2003) The water framework directive: a new directive for a changing social, political and economic European framework. Eur Plan Stud 11(3):299–316. https://doi.org/10.1080/09654310303640

    Article  Google Scholar 

  • Kidd S, Shaw D (2007) Integrated water resource management and institutional integration: realising the potential of spatial planning in England. Geogr J 173(4):312–329

    Article  Google Scholar 

  • Lane MB, McDonald G (2005) Community-based environmental planning: operational dilemmas, planning principles and possible remedies. J Environ Plan Manage 48(5):709–731

    Article  Google Scholar 

  • Lingua V (2016) Sessione speciale ripensare l’area vasta. Urbanistica Informazioni 4:449–451

    Google Scholar 

  • Lowe K (2011) Neighborhood, city, or region: deconstructing scale in planning frames. Berkeley Plan J. https://doi.org/10.5070/BP324111864

    Article  Google Scholar 

  • Magnaghi A (2008) I contratti di fiume: verso nuove forme integrate e partecipate di pianificazione territoriale. Paper presented at the Seminar Processi di pianificazione partecipata di bacino, Bologna

    Google Scholar 

  • Magnaghi A, Giacomozzi S (eds) (2009) Un fiume per il territorio. Indirizzi progettuali per il parco fluviale del Valdarno empolese, vol 83. Firenze University Press, Firenze

    Google Scholar 

  • Marchigiani E (2006) Una rinnovata stagione per la pianificazione territoriale intercomunale. Urbanistica Informazioni 210:5–27

    Google Scholar 

  • Margerum RD (1997) Integrated approaches to environmental planning and management. J Plan Lit 11(4):459–475

    Article  Google Scholar 

  • Martínez JMÁ, Suárez-Seoane S, Calabuig EDL (2011) Modelling the risk of land cover change from environmental and socio-economic drivers in heterogeneous and changing landscapes: the role of uncertainty. Landsc Urban Plan 101(2):108–119

    Article  Google Scholar 

  • Mattila H, Purkarthofer E, Humer A (2020) Governing ‘places that don’t matter’: agonistic spatial planning practices in finnish peripheral regions. Territ Politi Gov. https://doi.org/10.1080/21622671.2020.1857824

    Article  Google Scholar 

  • Medema W, McIntosh BS, Jeffrey PJ (2008) From premise to practice: a critical assessment of integrated water resources management and adaptive management approaches in the water sector. Ecol Soc. https://doi.org/10.5751/ES-02611-130229

    Article  Google Scholar 

  • Mendes W (2007) Negotiating a place for ‘sustainability’policies in municipal planning and governance: the role of scalar discourses and practices. Space Polity 11(1):95. https://doi.org/10.1080/21622671.2020.1857824

    Article  Google Scholar 

  • Naveh Z, Carmel Y (2002) Landscape complexity versus ecosystem complexity-implication for landscape planning and management. Ecosystems 37(38):19–39

    Google Scholar 

  • Pahl-Wostl C, Jeffrey P, Isendahl N, Brugnach M (2011) Maturing the new water management paradigm: progressing from aspiration to practice. Water Resour Manage 25:837–856

    Article  Google Scholar 

  • Pappalardo G (2021) Paesaggi tenaci: Il processo ecomuseale del Simeto. FrancoAngeli, Milano

    Google Scholar 

  • Pisano C, Lingua V (2021) The impact of regional design on river agreements: the case of the ombrone river in Tuscany. Plan Pract Res. https://doi.org/10.1080/02697459.2021.2005870

    Article  Google Scholar 

  • Pizziolo G, Micarelli R (2011) Il contratto di fiume/paesaggio del medio Panaro. In: Bastiani M (ed.) Contratti di fiume. Pianificazione strategica e partecipata dei bacini idrografici. Flaccovio Editore, Palermo 323–343.

  • Schoeman J, Allan C, Finlayson CM (2014) A new paradigm for water? A comparative review of integrated, adaptive and ecosystem-based water management in the Anthropocene. Int J Water Resour Dev 30(3):377–390

    Article  Google Scholar 

  • Scholz JT, Stiftel B (eds) (2005) Adaptive governance and water conflict: new institutions for collaborative planning. Resources for the Future Press, Washington

    Google Scholar 

  • Selman P (2006) Planning at the landscape scale. Routledge, London

    Book  Google Scholar 

  • Swyngedouw E, Cox K (1997) Neither global nor local:’glocalization’and the politics of scale. In: Cox KR (ed) Spaces of globalization: reasserting the power of the local. Guilford Press, New York, pp 137–166

    Google Scholar 

  • Van der Brugge R, Rotmans J, Loorbach D (2005) The transition in dutch water management. Reg Environ Change 5(4):164–176

    Article  Google Scholar 

  • Webb NP, Marshall NA, Stringer LC, Reed MS, Chappell A, Herrick JE (2017) Land degradation and climate change: building climate resilience in agriculture. Front Ecol Environ 15(8):450–459. https://doi.org/10.1002/fee.1530

    Article  Google Scholar 

  • White I, Howe J (2003) Policy and practice: planning and the European union water framework directive. J Environ Plan Manage 46(4):621–631

    Article  Google Scholar 

  • Xilo G, Baldi B (2012) Dall’unione alla fusione dei comuni: le ragioni, le criticità e le forme. Istituzioni Del Federalism 1:141–165

    Google Scholar 

  • Zwet AVD, Ferry M (2019) Integrated sustainable urban development strategies in the European union: added value and challenges. In: Medeiros E (ed) Territorial cohesion. Springer International Publishing, Cham

    Google Scholar 

Download references

Acknowledgements

Not applicable' for that section.

Funding

Not applicable’ for that section.

Author information

Authors and Affiliations

Authors

Contributions

The authors have shared all the fieldwork and thus elaboration of this contribution as far as the paragraphs are attributable as follows: De Leo 1, 2, 4; Altamore: 3.1, 3.2, 4.

Corresponding author

Correspondence to Daniela De Leo.

Ethics declarations

Competing interests

Not applicable’ for that section.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Altamore, S., De Leo, D. Towards a cooperative governance. Lessons learned from the only Italian “River, Lake, and Coastal” Contract. City Territ Archit 10, 19 (2023). https://doi.org/10.1186/s40410-023-00201-9

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1186/s40410-023-00201-9

Keywords